SEANAV MARINE
400+
projects completed
20+
years experienced team
OEM
trained specialists
24/7
emergency response

⚡ generator synchronization

Multi-Generator Control · Seamless Paralleling · Load Distribution

  • ✓ Multi-generator synchronization
  • ✓ Automatic transfer schemes
  • ✓ Load dispatch systems
  • ✓ Frequency control logic
  • ✓ Fault protection coordination
  • ✓ System stability analysis
  • ✓ Testing and commissioning

Experienced with ABB, Siemens, Schneider, Mitsubishi, Terasaki, L&T – our team delivers.

🔧 generator synchronization systems components

Controllers · Synchronizers · Protection

Synchronization Equipment

  • ✓ Multi-Generator Controllers
  • ✓ Synchronizing Modules
  • ✓ Automatic Transfer Switches
  • ✓ Load Dispatch Modules
  • ✓ Frequency Controllers
  • ✓ Voltage Controllers

Protection & Monitoring

  • ✓ Generator Protection Relays
  • ✓ Sync Check Relays
  • ✓ Loss of Sync Protection
  • ✓ Fault Protection Logic
  • ✓ Automatic Load Shedding
  • ✓ System Monitoring Panels

🔋 emergency generator integration

Diesel Generators · Starters · Changeover · Protection

Emergency generator sets

  • ✓ MAN – D2862, D2842 series (emergency gensets)
  • ✓ MTU – 4000, 1600 series (emergency power)
  • ✓ Caterpillar – C9, C18, C32, 3500 series (emergency)
  • ✓ Scania – DI13, DI16 marine gensets
  • ✓ Volvo Penta – D13, D16 marine gensets
  • ✓ Kohler – Marine emergency generators
  • ✓ John Deere – Marine generator engines

Generator control & changeover

  • ✓ Automatic changeover switches – ABB OTM, Socomec, ASCO
  • ✓ Generator control panels – ComAp, Deif, Woodward, Deep Sea
  • ✓ Emergency generator starters – Battery chargers, start logic
  • ✓ Blackout start & load pickup
  • ✓ Generator protection relays – ABB, Siemens, Schneider
  • ✓ Remote start/stop from bridge

🔄 automatic bus transfer (abt)

Breaker Interlocking · Priority · Load Shedding

ABT system components

  • ✓ Bus tie breaker control – Automatic closing/opening
  • ✓ Breaker interlock logic – Mechanical & electrical
  • ✓ Priority management – Essential loads first
  • ✓ Load shedding on generator failure
  • ✓ Automatic restoration after blackout
  • ✓ PLC-based ABT controllers – Siemens, Rockwell, Mitsubishi

Integration with main switchboard

  • ✓ Main bus to emergency bus transfer
  • ✓ Dead bus closing logic
  • ✓ Synchronizing check for bus tie
  • ✓ Reverse power protection during transfer
  • ✓ Communication with PMS
  • ✓ Remote monitoring of bus status

💡 emergency lighting distribution

Emergency Light Panels · Battery Backup · SOLAS

Emergency lighting panels

  • ✓ Emergency lighting distribution boards
  • ✓ Central battery systems
  • ✓ Individual emergency light units
  • ✓ Escape route lighting
  • ✓ Low-location lighting (LLL)
  • ✓ Photoluminescent systems integration

Battery & charger systems

  • ✓ Emergency battery banks – Lead-acid, Ni-Cd
  • ✓ Battery chargers – Float, boost, temperature compensated
  • ✓ Battery monitoring systems – Voltage, current, temperature
  • ✓ Automatic battery test systems
  • ✓ UPS for critical emergency loads

🚨 essential services power

Fire Pumps · Steering · Navigation · Communications

  • ✓ Fire pump power supply panels – Direct from ESB
  • ✓ Emergency fire pump starters
  • ✓ Steering gear emergency power – Alternative supply
  • ✓ Navigation light power panels – Dual supply
  • ✓ Communication equipment power – GMDSS, radios, internal comms
  • ✓ Watertight door power supply – Emergency operation
  • ✓ Emergency ventilation fans – Engine room, accommodation
  • ✓ Alarm & monitoring systems power – IAS, AMS, fire alarm
  • ✓ Public address & general alarm
  • ✓ Emergency bilge pump power
  • ✓ CO2 / fire suppression system power
  • ✓ Emergency escape release systems

🔄 esb retrofit & upgrade

Modernization · SOLAS Upgrades · Breaker Replacement

  • ✓ Legacy emergency switchboard modernization – Replace obsolete components
  • ✓ Breaker replacement – Old ACB/MCCB to new equivalents (ABB, Siemens, Terasaki)
  • ✓ Protection relay upgrade – Electromechanical to numerical
  • ✓ Busbar replacement & reinforcement – For higher fault levels
  • ✓ Metering upgrade – Analog to digital multifunction meters
  • ✓ PLC-based control retrofit – For automatic transfer logic
  • ✓ Communication integration – Modbus, Profibus for remote monitoring
  • ✓ SOLAS compliance upgrades – Meeting latest regulations
  • ✓ Emergency generator control upgrade – New controllers (ComAp, Deif)
  • ✓ Battery charger & UPS replacement
  • ✓ Spare parts supply – For all makes
  • ✓ Class survey support – ABS, DNV, LR, BV, NK, RINA

🌍 esb service coverage

Vessels & Facilities We Serve

Vessel Types

  • ✓ VLCC / ULCC Tankers
  • ✓ Suezmax / Aframax
  • ✓ Capesize / Panamax Bulk
  • ✓ Container Vessels (Post-Panamax)
  • ✓ LNG / LPG Carriers
  • ✓ PSV / AHTS / OSV / MPSV
  • ✓ Drilling Rigs / Semi-sub / Jack-up
  • ✓ FPSO / FSO / FLNG Units
  • ✓ Cruise Ships / Ro-Ro / Ferries
  • ✓ Naval / Coast Guard Vessels
  • ✓ Dredgers / Heavy Lift Vessels
  • ✓ Mega Yachts

Global Service Locations

  • ✓ UAE (Dubai, Abu Dhabi, Fujairah)
  • ✓ India (Mumbai, Kochi, Chennai, Kandla)
  • ✓ Singapore
  • ✓ Netherlands (Rotterdam, Amsterdam)
  • ✓ Norway (Stavanger, Bergen, Oslo)
  • ✓ USA (Houston, New Orleans, Seattle)
  • ✓ Brazil (Rio de Janeiro, Santos)
  • ✓ China (Shanghai, Hong Kong, Shenzhen)
  • ✓ South Korea (Busan, Ulsan)
  • ✓ Japan (Tokyo, Yokohama, Kobe)
  • ✓ Middle East / Gulf Ports
  • ✓ Worldwide Ports & Shipyards

⚡ 24/7 generator synchronization support

Need Generator Synchronization systems
service, retrofit, or upgrade?

Our electrical engineers provide complete installation, troubleshooting, retrofit, and repair services for all generator synchronization systems. Available 24/7 worldwide for emergency response.

Email: service@seanav.org | Web: www.seanav.org | 24/7 Emergency: +971 50 123 4567

// Stay Updated

Marine Tech Bulletin

Equipment alerts, GMDSS updates, and port news — delivered to your inbox. No spam.

💬 WhatsApp 📞 +971 58 568 1197 ⚡ 24/7 Dispatch